Home / News / Installation steps of shower room

Installation steps of shower room

Update:14 Jan 2021

The installation of shower room first needs to prepare the tools that will be used in the installation. The specific steps are as follows: install the bottom basin → test and protection → install aluminum material → fix the glass → install the pipe jacking → install the shelf → install the movable door → do a good job in waterproof → debug and fasten → finish the work.

1、 Installation of bottom basin: the basin parts shall be assembled well, and the bottom basin shall be adjusted to the horizontal position, so as to ensure that there is no ponding in the basin and in the basin. The hose setting can be adjusted according to the distance to firmly connect the basin bottom with the floor drain.
2、 Test and protection: after installation, water test shall be carried out to ensure smooth launching without blockage.
3、 Installation of aluminum material: knock rubber particles into the drilling hole and lock the aluminum strip into the wall with screws.
4、 Fixed glass: first clamp the glass, lock it into the drilling position of the bottom basin, and fix it with screws.
5、 Installation of pipe jacking: find the drilling position above the fixed glass, install the (straight / inclined) fixed seat, connect the pipe jacking, and fix it on the top of the glass with elbow sleeve.
6、 Install the shelf: first, measure the installation position of the shelf, tighten the nuts of the laminate, and fix the laminate glass in the vertical and horizontal position.
7、 Install the movable door: install the hardware of the movable door, and install the hinge at the reserved hole of the fixed door. After installation, you need to adjust the hinge axis position to feel the best fashion of closing the door.
8、 Good waterproof: according to the requirements, the side or the bottom of the glass should be installed with suction strip or water retaining strip, and the joints between the wall, glass and the bottom basin should be sealed with silica gel.
9、 Debugging and fastening: check and test the installed parts to see if they are comfortable and smooth to use. If there is any problem, it should be adjusted in time, and then don't forget to tighten the corresponding screws.
10、 Finishing work: first, the decorative aluminum strip is embedded in the wall aluminum, so that the appearance looks neat and generous. Finally, wipe the shower room clean with a rag to make this small area fresh and clean.

2. Precautions for installation of shower room
Of course, the most important thing to install a shower room is to use it comfortably and conveniently. If the service life can be extended, it also needs to be included in the scope of thinking. What should we pay attention to in the installation of shower room?
1、 The shower room should be carried vertically by more than two people at the same time. As the glass is easy to be broken, it should be handled with great care to avoid collision with hard objects.
2、 After the package is removed, the glass should be placed vertically and stably against the wall. If it is not placed stably, it is easy to damage the glass or hurt people nearby.
3、 When cleaning the surface of shower room, clean water or neutral detergent should be used. If the stain is difficult to remove, a small amount of alcohol is recommended. Do not use acid, alkali, organic solvent chemicals and acid cleaners to clean, otherwise it will damage the surface of the product.
4、 When you want to clean the dust of acrylic basin, you can use cotton cloth dipped in a little soapy water to remove it.
5、 When using sealed silica gel, pay attention not to apply silica gel on the surface of acrylic sanitary ware. If it is applied carelessly, it can be removed carefully after it is completely cured. Do not scratch with hard objects, because it will damage the surface of the product. After the installation of acrylic basin, it needs to be used after the silica gel is completely cured (about 24 hours later).